To achieve these goals the team had to protect the original oak timbers and supply and fix new soft wood larch laths. Then the building had to have 2-3 coat lime render applied to match the existing render whilst allowing a slight shadow gap to aid the possible movement of the structure. Finally, the original cast decorative panels had extensive repairs and new panels reinstated to match the originals.